I was told the the 365 was needing to get her 92 day inspection done. I imagine that's the reason why it wasn't;t put in the lead for the trip north. |
Date:
8/7/2023 |
Location:
Akron, OH Map ![Show Akron on a rail map](/images/map_us.gif) |
Views:
76 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Fred Stuckmann |
Locomotives: |
Author: Fred Stuckmann
|
![CVSR 365](/pictures\148631\16.jpg) |
Picture Categories: Passenger,Action |
This picture is part of album: ABC uses Wheeling power to deliver CVSR 365. |