Valley Interchange Track Signal, displaying Aspect Red/Red/Red NORAC Rule 291, Name Stop and Proceed INDICATIOn; Stop then proceed at Restricted Speed until the entire train has cleared all interlocking and spring switches(if signal is an interlocking or CP signal) and the leading wheels have; 1 Passed a moer favorable fixed signal, 0 Entered non signaled DCS territory . Lehigh Line is partially visible |
Date:
8/17/2022 |
Location:
Bound Brook, NJ Map  |
Views:
104 |
Collection Of:

Steve Coraggio |
|
Author: Steve Coraggio
|
 |
Picture Categories: Scenic,Yard,Signal,Track,Action |
This picture is part of album: MA-2, (Manville 2) East on Track 2, then crosses over to track 1 east with one covered hopper for Bo |