Making the run around at the westerly end of the current 5 miles of track under operation. Aaout 500 feet further to the right is a long road crossing which needs to be rebuilt before trains can travel further towards Green Lake the planned eventual destination. /DL |
Date:
7/31/2010 |
Location:
Ellsworth Falls, ME Map  |
Views:
341 |
Collection Of:

David Larrabee |
Locomotives: |
Author: David Larrabee
|
.JPG) |
Picture Categories: Roster,RollingStock,Yard,Station,Passenger,Action |
This picture is part of album: DSRX - Summer '10 |