A two month old SD70M-2 leads the transfer down to Northtown on an overcast down. I bet the engineer liked running such new power! |
Date:
5/3/2010 |
Location:
New Brighton, MN Map ![Show New Brighton on a rail map](/images/map_us.gif) |
Views:
772 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Douglas Hildebrandt |
Locomotives: |
Author: Douglas Hildebrandt
|
![CN 8913](http://s3.amazonaws.com/rrpa_photos/55461/CN%208913%205-3-2010%20New%20Brighton.jpg) |
Picture Categories: |
This picture is part of album: Wisconsin Central-Minneapolis 8 |